THE 2-MINUTE RULE FOR CONSUMER UNIT INSTALLATION LONDON

The 2-Minute Rule for Consumer unit installation London

The MCBs should be clipped on to the Din bar along with the busbar into a present-day flowing terminal and restricted screwed to provide current into the MCBs.Two 16/25mm tail cables, 1 neutral and one other Energetic are connected to the leading double pole switch on the meter. The primary earth cable should be screwed in the earth block, and the

read more